    Precast Concrete Erection and Installation Insurance

    Precast erection is lifting very heavy objects into position and then relying on something to hold them there until they are permanently connected.

    Held By Props Until It Is Connected

    A wall panel, a column, a beam, a stair flight or a hollowcore slab arrives finished, weighing several tonnes, and is lifted into place by crane. Between the moment the crane releases it and the moment the connection is grouted, bolted or welded, the unit is held by temporary propping and bracing. Get that wrong and a unit moves, falls, or brings others with it, and people are working beneath and beside the frame throughout.

    The other feature is that the units are finished products. A panel chipped, cracked or dropped is not repaired on site: it is remade in a factory, with a lead time, and the frame waits.

    What Precast Concrete Installer Insurance Covers

    Public liability at a frame limit

    Injury and damage to third parties, including everybody working beneath and beside an erection operation. £10 million is routine on main contractor work.

    Temporary stability and collapse

    The exposure that defines the trade. A unit or a frame that moved before connections were complete, which is a multi casualty event.

    Damage to units

    Precast is a finished product. A chipped, cracked or dropped unit is remade in a factory with a lead time rather than repaired.

    Employers' liability

    Compulsory at a £5 million statutory minimum. Working at height on and around a frame, slinging, and working under suspended loads.

    Lifting operations

    Every unit is a lift, and whether you hold a contract lift or hire a crane with operator decides who carries a lifting failure.

    Professional indemnity for temporary works

    Propping and bracing design, and the erection sequence, are engineering judgements. Mechanics on our professional indemnity page.

    Damage to the supporting structure

    Units bear onto in situ concrete, steelwork or masonry built by others, and a bearing that fails damages both.

    Where The Cover Stops

    Wordings differ between insurers, so treat these as the usual position rather than as universal fact. Where one of them matters to you, it is worth checking on your own schedule before you need to.

    Propping and bracing design

    A collapse before connections are complete traces to a temporary works scheme rather than to workmanship, and whose scheme it was decides the claim.

    Bearings built by others

    Units sit on a structure somebody else built, at levels somebody else set. A bearing that is short or out of level is not your work and is your problem.

    Lead times on replacement units

    A damaged panel is remade. The programme consequence is the real loss and it is frequently larger than the unit.

    Lifting points and inserts

    Units are lifted by cast in inserts. A missing, damaged or wrongly specified insert is a dropped load.

    Wind during erection

    A large flat panel on a crane hook is a sail, and a partly braced frame is more vulnerable than a complete one.

    Grouting and connection curing

    A connection has no strength until it has cured, so removing props early is the same failure as striking formwork early.

    The Dangerous Period Is Between Lift And Connection

    Precast erection has a window in every unit's installation where nothing permanent is holding it, and that window is the whole safety case.

    A unit is landed, plumbed and propped, and the crane is released. From that point until the connection is made and has gained strength, the unit stands because of temporary propping, bracing or a tie back to something already stable. The recognised failures are a prop on an inadequate base, props removed to get access for a following trade, a brace omitted because a unit looked stable, a frame erected beyond the extent the bracing scheme allowed, and a connection grouted and propped off before the grout had cured. Any of those can take out a single unit or a run of them.

    So the erection sequence and the propping scheme are the documents that matter, and they need to be followed rather than consulted. A scheme that states the propping and bracing for each stage, the maximum extent of frame that may stand before tying in, the curing time before props come off, and a rule that nobody removes a prop without authority. Then a record at each stage. A contractor whose file shows a scheme and sign offs is in a very different position from one whose erectors made sensible decisions.

    Somebody Else Built The Bearing

    Precast arrives to millimetre tolerances and lands on a structure built to construction tolerances, and that mismatch causes a surprising share of this trade's disputes.

    A unit needs a bearing of a specified length, at a specified level, on a surface that is flat and sound. In practice it arrives at an in situ concrete wall cast slightly out of position, a steel beam set a few millimetres low, masonry that is not level, or a pad that has the wrong bedding. The options are then packing it, which may be outside what the design allows, refusing to erect, which stops the job, or proceeding and hoping, which is how a short bearing ends up in a finished frame where nobody can see it.

    So the survey before erection is the protection and it is quick. Check and record bearing levels and dimensions before units are lifted rather than discovering them with a panel on the hook, raise anything outside tolerance in writing before erecting, and get an engineer's instruction where packing or a modification is needed. Where a main contractor presses to erect onto a bearing you have flagged, that instruction belongs in writing, because a short bearing discovered years later is examined against who installed the unit.

    A Damaged Unit Is A Lead Time

    Precast is manufactured rather than built, which changes what damage costs.

    A unit chipped on a corner, cracked by a bad lift, dropped, or damaged in transit cannot be made good on site in the way an in situ element can. It goes back to the factory to be remade, and the frame stops at that point in the sequence because precast erection is linear: you cannot generally skip a unit and come back. So the loss is the unit plus the crane standing plus the gang standing plus the programme, and on a tight site with a booked crane that is a substantial figure for a chipped corner.

    So handling is where the money is protected. Lifting only by the cast in inserts rather than by a convenient point, slings and spreader beams appropriate to the unit rather than what is on the lorry, units stored and stacked as the manufacturer specifies with correct bearers, inspection on delivery with damage recorded and rejected before it is lifted, and care at the final placement where a unit is swung into position against something already built. Transit damage recorded on arrival is the difference between the haulier's problem and yours.

    Everything Is A Lift

    There is no part of precast erection that does not involve a crane, which puts this trade inside the lifting question whether it wants to be or not.

    Every unit is lifted, frequently at or near the crane's capacity at that radius, over a live site, with the gang working beneath to receive it. That brings the whole lifting apparatus with it: appointed persons, lift plans, ground bearing for the crane, slinger competence, and above all the distinction between a contract lift and crane hire with operator, which decides who carries a lifting failure. Precast erectors sit on the hiring side of that question and frequently do not know which basis they are on.

    So establish it per job rather than per relationship. Confirm in writing whether the crane comes as a contract lift or as hire with operator, and if the latter, understand that the lift planning, the appointed person and the responsibility for the operation are yours. Make sure your own people hold the competences that implies. And check the policy covers the lifting operation on the basis you actually work, because a contractor providing the appointed person under a hire arrangement carries more than one that buys contract lifts.

    How To Choose A Broker For Precast Erection

    Temporary stability and the lifting basis decide this one. We are an FCA regulated broker and will not tell you we are the best choice. These are the questions that decide it.

    Is temporary works design covered as advice?

    A collapse before connections are complete traces to a propping scheme rather than to workmanship.

    Does the limit reflect people beneath a frame?

    £10 million is routine, because an erection collapse is a multi casualty event rather than a property claim.

    Is damage to units covered, including the programme?

    A damaged panel is remade in a factory and the frame stops, so the lead time is the real loss.

    Which lifting basis do you actually work on?

    Contract lift against crane hire with operator decides who carries a lifting failure, and many erectors do not know which they are on.

    Is damage to the supporting structure covered?

    Units bear onto work built by others, and a bearing that fails damages both.

    Has the bearing survey been raised?

    A broker who asks about it understands where this trade's disputes actually start.

    Factually, here is what we do against those questions. We arrange professional indemnity where the propping and bracing scheme is yours, because a collapse traces to that rather than to an erector, we set the limit against people working beneath a frame, we ask which lifting basis your cranes come on and make sure the cover matches it, and we tell you to record bearing levels before units are lifted. We are a broker, so it goes to several insurers rather than one.

    We also insure structural steel contractors, formwork contractors and crane hire businesses, so frames, temporary stability and lifting are familiar ground here.

    What Moves The Price

    Every policy is priced on the business behind it. These are the things that move the premium:

    • Whether propping and bracing schemes are designed in house
    • Unit types and weights erected
    • Heights erected to and site types
    • Whether cranes come as contract lift or hire with operator
    • Whether you supply as well as erect
    • The limit of indemnity your contracts require
    • Whether erectors are employed or supplied
    • Claims history, including dropped units and collapses

    We are a broker, so we take it to several insurers rather than quoting one. Call 02382 000820 for a quote.

    What We Need To Quote

    • The unit types you erect and typical weights
    • Whether you design propping and bracing schemes
    • Typical and maximum erection heights
    • Whether cranes are contract lift or hire with operator
    • Whether you supply units as well as erecting them
    • Your bearing survey and pre-erection check procedure
    • The limit of indemnity required, and who requires it
    • Any claims in five years, including dropped units

    Cover that often goes with this

    The gaps we most often find sitting next to this policy.

    Common questions

    What insurance do precast concrete erectors need?+

    Public liability at £10 million on main contractor work, because people work beneath and beside an erection operation and a collapse is a multi casualty event. Then cover for temporary stability and collapse, damage to units which are remade in a factory rather than repaired, employers' liability at a £5 million statutory minimum, lifting operations cover on the basis you actually work, professional indemnity for propping and bracing design, and damage to the supporting structure built by others.

    When is a precast unit most at risk?+

    Between the crane releasing it and the connection gaining strength, which is the window in every unit's installation where nothing permanent is holding it. The recognised failures are a prop on an inadequate base, props removed to give a following trade access, a brace omitted because a unit looked stable, a frame erected beyond what the bracing scheme allowed, and a connection propped off before the grout cured. So follow a scheme that states the propping for each stage, the maximum frame extent before tying in, and the curing time before props come off.

    What if the bearing is not where it should be?+

    Raise it before erecting, because precast arrives to millimetre tolerances and lands on a structure built to construction tolerances. A unit needs a bearing of specified length at a specified level on a flat sound surface, and in practice it meets an in situ wall cast slightly out, a steel beam set low, or masonry that is not level. The options are packing beyond what the design allows, refusing to erect, or proceeding and hoping. So record bearing levels and dimensions before lifting, and get an engineer's instruction where packing is needed.

    Why is a chipped panel expensive?+

    Because precast is manufactured rather than built, so a damaged unit goes back to the factory to be remade and the frame stops at that point in the sequence, since erection is linear and you generally cannot skip a unit. The loss is the unit plus the crane standing, the gang standing and the programme. So lift only by the cast in inserts, use slings and spreader beams appropriate to the unit, store and stack as the manufacturer specifies, and inspect on delivery so transit damage is the haulier's problem rather than yours.

    Do we need to worry about the crane arrangement?+

    Yes, and many erectors do not know which basis they are on. Every unit is a lift, frequently near the crane's capacity at that radius, over a live site with a gang beneath receiving it. Whether the crane comes as a contract lift or as hire with operator decides who carries a lifting failure, and on a hire basis the lift planning, the appointed person and responsibility for the operation are yours. So confirm the basis in writing per job, make sure your people hold the competences that implies, and check the policy matches.

    Who insures precast erection contractors in the UK?+

    A specialist construction market rather than general trades, because temporary stability before connections are complete, lifting at capacity and damage to manufactured units do not fit an ordinary contractors policy. It is placed mostly through brokers. What separates placements is whether temporary works design is covered as advice, whether the limit reflects people beneath a frame, whether damage to units and the programme consequence is covered, and whether the lifting basis in the policy matches how you actually work.

    More food, drink and leisure we cover

    Cafés & Coffee ShopsBakeriesCaterersDark KitchensMicrobreweries & TaproomsChicken & Burger ShopsPersonal TrainersYoga & Pilates StudiosDance & Martial Arts SchoolsEvent & Wedding VenuesSoft Play CentresEscape RoomsCampsites & GlampingFire ProtectionTree SurgeonsDrainageTelecoms EngineersAccountantsArchitectsIT ConsultantsHealth & Safety ConsultantsSurveyorsCar Valeting & DetailingBuilding ConsultantsTraining ProvidersRefrigeration EngineersGutter ClearingEnergy Assessors & ConsultantsHandymanSubcontractorsAerial & Satellite InstallersAsbestos RemovalSecurity Systems InstallersConsulting EngineersWeb & Software DevelopersRope Access ContractorsConfined Space ContractorsSoft Strip ContractorsDrilling & Boring ContractorsPlant Hire BusinessesWaste & RecyclingMetal FabricatorsMachinery Installation & RemovalQuarries & AggregatesInterior DesignersCinemasSocial Clubs & Live MusicSignage & Sign ErectorsPrintersAV InstallersEstate & Letting AgentsManagement ConsultantsEvent & Exhibition OrganisersFencing ContractorsPest ControlFitted Furniture InstallersAntique DealersBookmakersPrivate & Freelance ChefsCeiling ContractorsConservatory InstallersDriveways & SurfacingInterior LandscapingSteeplejacksTraffic ManagementBasement ContractorsCavity Wall InsulationConcrete RepairStairlifts & AccessibilityCurtain Walling & FacadesConstruction Project ManagersMarketing & AdvertisingRecruitment AgenciesCall CentresAutomatic Doors & ShuttersChimney & Flue LiningConcrete SupplyPiling ContractorsFormwork & ShutteringLift InstallersWater TreatmentGuttering & RooflineQuantity SurveyorsBuilding ControlCompliance ConsultantsGarden CentresDry CleanersFuneral DirectorsSprinkler InstallersFire Alarm InstallersSwimming Pool InstallersStonemasonsThatchersBlacksmithsInsolvency PractitionersPatent & Trade Mark AttorneysTranslatorsBowling AlleysSolar Panel InstallersHeat Pump InstallersWindow Film InstallersAccess Control InstallersLandscape ArchitectsLoss AdjustersTown PlannersMortgage BrokersBuilders MerchantsGarden Machinery DealersCycle ShopsPicture FramersStained GlassGalvanisingPowder CoatingFrench PolishingLoft InsulationThermal InsulationLocksmithsTesting LaboratoriesAcoustic ConsultantsTutorsUpholsterersNail StudiosCrane HireScreeding ContractorsHoist InstallersCarpet & Upholstery CleaningFinancial AdvisersPublic RelationsHR ConsultantsFishmongersOff LicencesNewsagentsMuseumsTheatresLoft ConversionsDesign & BuildHouse BuildersBridges & HighwaysMachine ShopsPlant RepairersAgricultural ContractorsFood ProductionLighting & RiggingLightning ProtectionSteel MerchantsCasinosTunnellingUnderpinningRoad SurfacingSteel FixersWind Turbine EngineersOverhead LinesmenUtilities ContractorsRailway EngineeringSafety NettingFit Out ContractorsShopping CentresTheme ParksBlast CleaningPassive Fire ProtectionMastic SealantStone WorktopsForklift EngineersHydraulic EngineersForestry ContractorsNDT InspectionOccupational HealthPetrol StationsFilm StudiosPlayground EquipmentRoller Shutter DoorsPump EngineersPartitioningRenderingSports SurfacingRefractory EngineersPension ConsultantsRating & ValuationGeotechnical EngineersRecording StudiosSpray TanningPipe LayingConveyor EngineersCommercial Boiler EngineersPlastics ProcessorsGlass ProcessingHoarding ContractorsAwning InstallersSeating ContractorsProperty MaintenanceCorrosion ConsultantsExhibition CentresEscalator Engineers