CoverTrade

    Lighting and Rigging Contractor Insurance

    Rigging contractors put substantial suspended loads above people, in buildings and sites they do not own, using fixing points somebody else installed.

    Loads Above People, In Somebody Else's Building

    A truss, a lighting bar, a line array, a projector, a screen or a scenery piece is hung over an audience, a conference, a congregation or a crowd. The building's rigging points were designed by somebody else, for loads nobody has recalculated, and the production wants more in the air than last time. The crew arrives on a get-in, works at height under time pressure, rigs, and the load hangs there with people underneath it until the get-out.

    Outdoors it changes again: temporary structures, ground conditions, and wind, which is the thing that brings staging and screens down rather than any failure of the rigging itself.

    What Lighting and Rigging Contractor Insurance Covers

    Public liability at a crowd limit

    Injury and damage to third parties, meaning the audience below. £10 million is routine and venues and promoters commonly specify it.

    Suspended loads and dropped objects

    The exposure that defines the trade. Anything leaving a rigging point above people, from a fitting to a truss.

    Damage to the venue structure

    Rigging points, roof members, plaster, beams and historic fabric, which belong to the venue rather than your client.

    Professional indemnity for rigging plots

    Load calculations, point selection and structural assumptions are engineering judgements. Mechanics on our professional indemnity page.

    Employers' liability

    Compulsory at a £5 million statutory minimum. Work at height, get-ins and get-outs under pressure, and long shifts.

    Equipment, owned and hired in

    Trusses, hoists, lighting, cable and control, which is high value, frequently cross hired, and constantly in transit.

    Temporary structures and wind

    Outdoor staging, roofs and towers, where wind management and a documented stop position are the whole safety case.

    Where The Cover Stops

    Wordings differ between insurers, so treat these as the usual position rather than as universal fact. Where one of them matters to you, it is worth checking on your own schedule before you need to.

    The venue's rigging points

    You are hanging from somebody else's structure. Who confirmed its capacity, and on what information, decides a failure claim.

    Load calculations and rigging plots

    A plot that overloaded a point or a beam is a calculation failure rather than a rigging error, which is advisory.

    Historic and unconventional buildings

    Churches, listed halls and converted buildings have points and timbers nobody has assessed for modern loads.

    Cross hired equipment

    Kit hired in from another company carries its own inspection history, and using it is your decision.

    Wind limits outdoors

    Temporary structures have wind speeds at which they must be de-rigged or evacuated, and the pressure not to call it is constant.

    Working over an occupied space

    Rigging while a venue is open, or over a space that cannot be cleared, is a different activity from rigging an empty room.

    You Did Not Design The Thing You Are Hanging From

    This is the structural question in event rigging and it is asked far too late far too often.

    A rigging contractor arrives at a venue and uses points, beams, trusses or steelwork that somebody else installed, sometimes decades ago, for loads that were set for a different purpose. The venue may have a rigging plot and a stated capacity per point, or it may have a technical manager who believes a beam is fine because nothing has fallen yet. In a church, a listed hall, a marquee or a converted industrial building there may be no documentation at all. The contractor then hangs a modern production from it, which is heavier than anything the building has carried.

    So the capacity question has to be answered before the first hoist goes up, and the answer has to be written down. Ask the venue for its rigging information and capacity per point, record what was provided and by whom, and where there is nothing, treat it as an unknown structure requiring assessment rather than assuming. On historic and unconventional buildings that may mean an engineer, and the cost of one is trivial against the alternative. Where a venue cannot or will not confirm capacity, rigging from the floor is the answer rather than hanging and hoping.

    Nothing Comes Off A Truss

    The thing that defines this trade's severity is that everything is above people, including small items.

    A shackle, a bolt, a safety bond, a colour frame, a clamp, a tool or a cable tail falling from twelve metres onto a crowd causes serious injury, and a truss or a fixture coming down is a multi casualty event. The failure modes are familiar to every rigger: a clamp not tightened, a shackle not made off, a safety bond omitted because the hang was quick, a hoist chain not terminated properly, a point overloaded because the plot changed on the day, and a tool not tethered.

    So the discipline is procedural and absolute. Secondary safeties on everything suspended as a rule rather than a habit, tool tethering at height without exception, a check of every hang by somebody other than the person who made it, a signed off plot before the room opens, and a rule that a change to the plot on the day goes back through the load calculation rather than being accommodated. Those checks are also what an investigation looks for, and a crew that can show a signed pre-show check is in a very different position from one relying on experience.

    Outdoors, Wind Is The Hazard

    Temporary structures outdoors fail in one way more than any other, and it is not a rigging failure.

    A stage roof, a screen, a tower, a PA wing or a banner is a sail. Wind loads rise sharply with speed, and a structure that is entirely safe at twenty miles an hour is not at forty. The recognised failures are a roof lifting, a tower going over, a screen folding, and ballast or anchoring that was adequate for the calculated load but not for the ground it was on after rain. The pressure not to act is enormous, because de-rigging or evacuating means a show does not happen and somebody loses a great deal of money.

    So the wind management plan is the safety case, and it only works if somebody has authority to use it. Wind speeds measured on site rather than taken from a forecast, defined action levels with specified actions at each, a named person with authority to stop, agreement with the promoter in advance about who makes that call and that it will be respected, and ballast and anchoring designed for the actual ground condition. Insurers ask about this directly on outdoor work, and a contractor who has stopped a show before presents as a professional rather than a problem.

    The Get-Out Is When People Get Hurt

    Across this sector the injuries concentrate at the end of the job rather than the beginning, and the reasons are the same every time.

    A get-out happens late, after a show, with a crew who have already worked a long day, frequently in reduced lighting, with everybody wanting to be away and vehicles waiting. Equipment comes down faster than it went up, heavy items are moved on flat floors with crowds leaving, and corners get cut because the room has to be clear by a deadline. The injuries are falls, crush injuries from dropped or rolling equipment, manual handling, and vehicle incidents in a loading bay.

    Which is why insurers focus on it. Realistic shift limits with a stated maximum rather than working until the truck is loaded, adequate lighting maintained for the get-out rather than switched to house lights, a rule that nothing comes down over an area that is not cleared, enough crew for the weight rather than enough to finish, and a loading bay procedure with a banksman. A company that can describe how it manages a 2am get-out is describing the part of its operation where the claims actually happen.

    How To Choose A Broker For Rigging Work

    The venue's structure is the question. We are an FCA regulated broker and will not tell you we are the best choice. These are the questions that decide it.

    Does the limit reflect a crowd below the rig?

    £10 million is routine, and venues and promoters commonly specify it before they will let you in.

    Is damage to the venue structure covered?

    Rigging points, beams, plaster and historic fabric belong to the venue rather than your client.

    Are rigging plots and load calculations covered as advice?

    An overloaded point is a calculation failure rather than a rigging error.

    Are temporary structures outdoors included?

    Stage roofs, towers and screens are a different exposure from rigging inside a venue, driven by wind.

    Is cross hired equipment covered?

    Kit hired in from another company arrives with its own inspection history, and using it is your decision.

    Is working over an occupied space addressed?

    Rigging while a venue is open is a different activity from rigging an empty room.

    Factually, here is what we do against those questions. We set the limit against the crowd below the rig rather than a venue capacity, we confirm damage to the venue's own structure is covered because that is whose beams you are using, we arrange professional indemnity where you produce rigging plots and load calculations, and we deal with outdoor temporary structures separately because wind is a different risk entirely. We are a broker, so it goes to several insurers rather than one.

    We also insure theatres, event venues and event organisers, so suspended loads, hirers and crowds are familiar ground here.

    What Moves The Price

    Every policy is priced on the business behind it. These are the things that move the premium:

    • Whether work is indoor, outdoor or both
    • Whether temporary structures and stage roofs are provided
    • Whether rigging plots and load calculations are produced
    • Typical and maximum suspended loads
    • Venue types, including historic and unconventional buildings
    • Equipment values, owned and cross hired
    • The limit of indemnity venues and promoters require
    • Claims history, including dropped objects

    We are a broker, so we take it to several insurers rather than quoting one. Call 02382 000820 for a quote.

    What We Need To Quote

    • The work you carry out, indoor and outdoor split
    • Whether temporary structures or stage roofs are supplied
    • Whether you produce rigging plots and load calculations
    • Typical and maximum loads suspended
    • How venue rigging capacity is confirmed before a hang
    • Equipment values, owned and cross hired
    • Your wind management plan and who has authority to stop
    • Any claims in five years, including dropped objects

    Cover that often goes with this

    The gaps we most often find sitting next to this policy.

    Common questions

    What insurance do rigging contractors need?+

    Public liability at £10 million, which venues and promoters commonly specify, because the third parties are a crowd directly beneath suspended loads. Then cover for damage to the venue's own structure including rigging points, beams and historic fabric, professional indemnity where you produce rigging plots and load calculations, employers' liability at a £5 million statutory minimum for work at height, equipment cover including cross hired kit, and cover contemplating temporary structures outdoors where wind is the hazard.

    Who is responsible if a venue's rigging point fails?+

    It turns on who confirmed its capacity and on what information, which is why the question has to be answered before the first hoist goes up. You are hanging from a structure somebody else installed, possibly decades ago, for loads set for a different purpose, and in a church, listed hall or converted building there may be no documentation at all. So ask the venue for rigging information and capacity per point, record what was provided and by whom, and treat an undocumented structure as requiring assessment rather than assuming it is fine.

    What stops small items falling onto an audience?+

    Procedure rather than care, because a shackle, bolt, clamp, colour frame or tool falling twelve metres causes serious injury. The failure modes are familiar: a clamp not tightened, a shackle not made off, a safety bond omitted on a quick hang, a hoist chain not terminated properly, a point overloaded because the plot changed on the day, and an untethered tool. So use secondary safeties on everything suspended as a rule, tether tools without exception, have every hang checked by somebody other than whoever made it, and sign off the plot before the room opens.

    How do you manage wind on outdoor structures?+

    With a plan somebody actually has authority to use, because a stage roof, screen or tower is a sail and wind loads rise sharply with speed. The recognised failures are a roof lifting, a tower going over, a screen folding, and ballast adequate for the calculated load but not for ground softened by rain. So measure wind on site rather than relying on a forecast, set defined action levels with specified actions, name a person with authority to stop, and agree with the promoter in advance that the call will be respected.

    Why do insurers ask about the get-out?+

    Because that is when the injuries happen. A get-out is late, after a show, with a crew who have worked a long day, in reduced lighting, with vehicles waiting and a deadline to clear the room, so equipment comes down faster than it went up and corners get cut. The injuries are falls, crush injuries from dropped or rolling equipment, manual handling and loading bay incidents. Expect questions about shift limits, lighting maintained for the get-out, nothing coming down over an uncleared area, crew numbers for weight, and a banksman in the bay.

    Who insures lighting and rigging contractors in the UK?+

    A specialist entertainment and events market rather than general trades, because suspended loads over crowds, venue structures you did not design and outdoor temporary structures do not fit an ordinary contractors policy. It is placed through brokers. What separates placements is whether the limit reflects the crowd below, whether damage to the venue's own structure is covered, whether rigging plots are covered as advice, and whether outdoor temporary structures are included.

    More food, drink and leisure we cover

    Cafés & Coffee ShopsBakeriesCaterersDark KitchensMicrobreweries & TaproomsChicken & Burger ShopsPersonal TrainersYoga & Pilates StudiosDance & Martial Arts SchoolsEvent & Wedding VenuesSoft Play CentresEscape RoomsCampsites & GlampingFire ProtectionTree SurgeonsDrainageTelecoms EngineersAccountantsArchitectsIT ConsultantsHealth & Safety ConsultantsSurveyorsCar Valeting & DetailingBuilding ConsultantsTraining ProvidersRefrigeration EngineersGutter ClearingEnergy Assessors & ConsultantsHandymanSubcontractorsAerial & Satellite InstallersAsbestos RemovalSecurity Systems InstallersConsulting EngineersWeb & Software DevelopersRope Access ContractorsConfined Space ContractorsSoft Strip ContractorsDrilling & Boring ContractorsPlant Hire BusinessesWaste & RecyclingMetal FabricatorsMachinery Installation & RemovalQuarries & AggregatesInterior DesignersCinemasSocial Clubs & Live MusicSignage & Sign ErectorsPrintersAV InstallersEstate & Letting AgentsManagement ConsultantsEvent & Exhibition OrganisersFencing ContractorsPest ControlFitted Furniture InstallersAntique DealersBookmakersPrivate & Freelance ChefsCeiling ContractorsConservatory InstallersDriveways & SurfacingInterior LandscapingSteeplejacksTraffic ManagementBasement ContractorsCavity Wall InsulationConcrete RepairStairlifts & AccessibilityCurtain Walling & FacadesConstruction Project ManagersMarketing & AdvertisingRecruitment AgenciesCall CentresAutomatic Doors & ShuttersChimney & Flue LiningConcrete SupplyPiling ContractorsFormwork & ShutteringLift InstallersWater TreatmentGuttering & RooflineQuantity SurveyorsBuilding ControlCompliance ConsultantsGarden CentresDry CleanersFuneral DirectorsSprinkler InstallersFire Alarm InstallersSwimming Pool InstallersStonemasonsThatchersBlacksmithsInsolvency PractitionersPatent & Trade Mark AttorneysTranslatorsBowling AlleysSolar Panel InstallersHeat Pump InstallersWindow Film InstallersAccess Control InstallersLandscape ArchitectsLoss AdjustersTown PlannersMortgage BrokersBuilders MerchantsGarden Machinery DealersCycle ShopsPicture FramersStained GlassGalvanisingPowder CoatingFrench PolishingLoft InsulationThermal InsulationLocksmithsTesting LaboratoriesAcoustic ConsultantsTutorsUpholsterersNail StudiosCrane HireScreeding ContractorsHoist InstallersCarpet & Upholstery CleaningFinancial AdvisersPublic RelationsHR ConsultantsFishmongersOff LicencesNewsagentsMuseumsTheatresLoft ConversionsDesign & BuildHouse BuildersBridges & HighwaysMachine ShopsPlant RepairersAgricultural ContractorsFood ProductionLightning ProtectionSteel MerchantsCasinosTunnellingUnderpinningRoad SurfacingSteel FixersWind Turbine EngineersOverhead LinesmenUtilities ContractorsRailway EngineeringSafety NettingFit Out ContractorsShopping CentresTheme ParksBlast CleaningPassive Fire ProtectionMastic SealantStone WorktopsForklift EngineersHydraulic EngineersForestry ContractorsFirework DisplaysNDT InspectionOccupational HealthPetrol StationsFilm Studios

    What our customers say on Google

    5.0average from 169 Google reviews